P6 Schedule Viewer

No schedule loaded ActualRemainingCritical (TF ≤ 0)Float Path 1 MilestoneWBS summaryData date BaselineRelationshipLate datesFloat

Open a schedule

  1. In Primavera P6, open the layout with WBS grouping and the columns Activity ID, Activity Name, Original Duration, Remaining Duration, Start, Finish, Actual Start, Actual Finish, Schedule % Complete, Physical % Complete, Total Float.
  2. Click in the activity table, press Ctrl+A then Ctrl+C.
  3. In Excel, click cell A1 of a blank sheet, press Ctrl+V, and save as .xlsx.
  4. Open that file here (or drag it onto this window).
  5. Or open a P6 .xer export directly for the full data (WBS, logic, codes, UDFs, resources, baseline).
  6. Or open a Microsoft Project .xml file (in Project: File > Save As > XML Format) for the full data: outline WBS, logic and lags, constraints, calendars, resources, baseline and custom fields. A binary .mpp is recognised and XERly shows how to save it as XML. File > Export to P6 XER writes a .xer copy for Primavera P6.
Works offline. Your file never leaves this computer.
Resource Usage Profile
Paste the layout (copied from P6 or from the Excel sheet, header row included):
Columns
Available Options
    Selected Options
      Double-click or drag to move a column. Drag within Selected Options to reorder. The order applies to screen and print.
      Sort
      (activities are sorted inside each group band, like P6; pick None for a flat list)
      Tip: click a column header to sort by it; Shift+click adds it as the next sort level.
      Bars




      Select project
      This XER holds more than one project. Pick the one to open:
      Page Setup

      Page

      Width 420 mm × Height 297 mm

      Scaling

      % normal size page(s) wide by tall page(s) wide
      Adjust to and Fit timescale to can be used together. Fit timescale sizes the Gantt so the date range spans that many pages wide; Adjust to then scales the whole print (text, rows and Gantt) by the percentage, and the date range still fills those pages. If neither is ticked, the print is 100%. Fit to pages wide by tall is a separate option and cannot be combined with the other two; 0 means not limited in that direction. Rows flow onto as many pages tall as needed unless Fit to sets a height limit.

      Header

      Footer

      Fields: {project} file name, {dd} data date, {printed} print date, {scale} timescale, {count} activity count, {page} / {pages} page numbers.

      Timescale range

      Leave the dates blank for automatic (whole schedule). Week start applies to the Weekly ticks, Daily week separators and print. Default is Saturday.

      Print options

      All columns prints every column selected in the Columns dialog, at full width, even if the table pane is narrowed or scrolled. Visible columns only prints the columns actually on screen at the current splitter width.
      Trace Float Path…
      Clear Float Path
      Show Critical only
      Export DCMA 14 to Excel…
      Trace Float Path
      Traces driving predecessors back to activities at the data date (in progress, or the first remaining activities with no further incomplete driving predecessors). Driving is computed from the displayed early dates and relationship lag — the viewer does not reschedule.
      Critical activities
      Definition used for the Critical column, the red remaining bars, and the Critical filter:
      Filters
      XERly
      P6 Schedule Viewer

      XERly by JVPCM Pty Ltd
      Developed by Jaime Linchangco

      A browser-based viewer for a Primavera P6 layout pasted into Excel, a P6 XER file, or a Microsoft Project XML export. Open the README.txt that ships with this file for the full steps.

      Features
      • Open a P6 .xer export, a Microsoft Project XML export, an Excel or CSV layout, or pasted rows, all on this computer, with no install and no internet.
      • Activity table with WBS bands, a synchronised Gantt chart, relationships, baseline bars, filters, Float Path and Critical / Longest Path. The Filters dialog and the Filters menu include a WBS filter: a searchable, collapsible WBS tree with checkboxes, Select All and Clear. Tick a node and its children are included. The WBS filter is applied together with the other filters (AND). Right-click a column header to Hide Column, or use Show Hidden Columns to bring one back (same list as Columns…; at least one column must stay visible). Double-click the divider on the right of a column header (Activity Name or any other column) to widen it to the longest value, including WBS bands.
      • Resource Usage Profile (Budgeted Labor Units) under the Gantt, aligned with the Daily, Weekly or Monthly timescale.
      • Update comparison (File > Compare with previous update…, or the Compare button): load the previous update (XER or MS Project XML) and optionally a baseline file; activities are matched by Activity ID. Tabs for Summary, Added/Deleted, Slippage, Critical path, Float erosion, Logic, Duration & progress and Units, a grey previous-update bar overlay on the Gantt, and an Excel export.
      • DCMA 14 detailed Excel export (Tools menu, toolbar, DCMA panel or right-click): a formatted .xlsx with Cover, Summary, All Issues and one sheet per check listing the activity IDs and evidence. Chrome and Edge ask where to save it.
      • Print Preview with viewer-drawn page numbers and P6-style Scaling: Adjust to a percentage and Fit timescale to a number of pages wide can be used together; Fit to pages wide by tall is a separate option. All or visible columns, and an optional histogram on the page. Zoom in or out on the preview (Fit Page, Fit Width, or 25–400%, Ctrl+plus / Ctrl+minus or Ctrl+mouse wheel) without changing the printed page.
      • Timescale like P6: drag the Gantt header left/right to stretch or compress (anchored at the cursor), drag the bars to pan; Daily, Weekly, Monthly, Quarterly and Yearly scales.
      • Activity Details (View menu, Ctrl+D or double-click): predecessors and successors with relationship type, lag, driving, dates and total float; click to go to an activity, Back/Forward to return.
      • User Preferences (Edit menu): Dates tab formats dates like P6 (order, 4-digit year, month name, leading zeros, separator, 12- or 24-hour time with minutes). Time Units tab formats durations and unit values (0, 1 or 2 decimals, optional unit label).
      • WBS band unit totals like P6: Budgeted, Actual, Remaining and At Completion Units roll up through every WBS level, kept separate for Labor, Nonlabor and Material, with Units % Complete on each band.
      • Look-ahead report (Tools menu): 2, 3, 4 or 6 weeks from the data date grouped by WBS, with Excel export and print. The dialog has a WBS scope: All WBS, or tick the WBS nodes you want (Select All and Clear are provided). The last WBS selection is remembered. Show in Gantt closes the report, filters the table to those activities in the chosen WBS, and frames the timescale from one week before the data date to one week after the window (for example, 3 weeks is DD-1W to DD+4W). A banner shows the filter and the WBS scope, and Clear restores the previous filters, columns and timescale range. Drag a corner or an edge of the Look-ahead Report (and of other large windows) to resize it; the table grows with the window and the size is remembered for the session.
      • Reports menu: Weekly One-Pager, Progress One-Pager, Look-ahead, Resource Usage Profile, DCMA 14-Point Assessment, Export DCMA 14 to Excel, Schedule Quality Score, Report PDF and Compare with previous update. Each one opens as a dialog or overlay over the current schedule, or downloads a file, and does not close the loaded view. Items are greyed out, with a tooltip, until a schedule is open.
      • Progress One-Pager (Reports menu, or the Progress button): one A3 or A4 landscape page for any XER. Cumulative S-curves for Early plan, Late plan, Baseline (when the XER has a baseline project), Earned (to the data date) and Forecast; a weekly histogram (weeks Saturday to Friday, labelled by the Friday week ending, dashed red data-date line); KPI tiles; PF, SPI and CPI panels with period and cumulative values and a trend (greyed out with "No actuals in XER" when the file has no actual hours or costs); milestones; critical and negative float with float erosion; 2 and 4 week look-ahead; WBS progress; schedule quality and progress data checks. Weighted by labour units, then cost, then duration. Pick a WBS to run it for one area. Print/PDF in Premium and above; Excel (with charts and formulas) in Super and above.
      • Weekly One-Pager (Reports menu): one A3 or A4 landscape page from the loaded XER, with an S-curve of planned, earned and forecast labour units (earned cumulative stops at the data date), period and cumulative progress and PF (earned = budget × Physical % or Units % / Duration %, as in P6; or SPI when actual hours are not in the file), an XERly logo by default (or your own image), and Excel or Print/PDF.
      • Schedule Quality Score (Tools menu): 0-100 and A-F grade from DCMA 14 plus XERly checks, with editable threshold profiles, and a one-click PDF report pack.
      • DCMA 14-Point Assessment (Tools menu): logic, leads, lags, relationship types, hard constraints, high and negative float, high duration, invalid dates, resources, missed tasks, critical path continuity, CPLI and BEI, with a click-through to the offending activities, a CSV export and a printable report. Results are computed by the viewer and may differ from P6 or from a formal DCMA review.
      Disclaimer

      XERly is a client-side web tool that parses .xer files, Microsoft Project XML exports, and Excel layouts directly in your browser without uploading your schedule to a server.

      • There is no server and no account, and no internet connection is needed after the file is opened.
      • Your schedule data is never uploaded, stored or shared. Only viewer settings (for example column choice and layout options) are kept in the browser's local storage on this computer.
      • There is no telemetry or tracking.
      • You are responsible for the confidentiality and handling of project data under your organisation's policies.
      • This is an independent, read-only viewer. It is not affiliated with or endorsed by Oracle or Microsoft. Primavera P6 is a trademark of Oracle. Microsoft Project is a trademark of Microsoft.
      • The viewer does not reschedule. Bars and relationship dates are those in the file.
      • Driving logic, Float Path, Longest Path, critical marking and histogram values are computed by the viewer and may differ from P6, especially with complex calendars, constraints or resource curves.
      • It is not a substitute for Primavera P6 or for professional planning judgement. Verify results against P6 before using them for contractual or reporting decisions.
      • The software is provided as-is, without warranty of any kind. Jaime Linchangco and JVPCM Pty Ltd accept no liability for loss or decisions arising from use of the viewer.
      Notes
      • Lags are shown in tooltips; they do not move bars. A small tolerance is used on driving logic. Results can differ from P6 if calendars, constraints or remaining start dates are more detailed than the file shows.
      • Headers, footers and page numbers (Page X of Y) are drawn by the viewer on every printed page, including layouts that span several pages wide and tall. They work in any browser. For a PDF, use Print and "Save as PDF", keep the paper size from Page Setup, and turn on "Background graphics".
      • The DCMA 14-Point Assessment counts working days on each activity's P6 calendar (work week and exceptions from CALENDAR clndr_data; Monday–Friday when no calendar is in the file), the data date in the viewer, and baseline dates from the file when they are present. The official Critical Path Test (delay a critical activity and reschedule) is not run, because the viewer does not reschedule; a longest-path continuity check is used instead. Thresholds and exclusions are listed in the assessment dialog. Verify figures against Primavera P6 before contractual or reporting use.
      • The Resource Usage Profile spreads Budgeted Labor Units across Monday-Friday working days between each activity or assignment start and finish. Activities with units but no dates are counted in the total and listed as "not placed (no dates)"; they do not appear as bars. An XER without activity or assignment dates (for example some exports) will show the correct total and an empty profile.
      • Microsoft Project XML: calendars (work week, working times, exceptions and base calendars) are applied to each task like P6 calendars, and durations, slack and lags keep their hours (hours per day from MinutesPerDay, default 8). Activity ID comes from a custom field aliased "Activity ID" when present, otherwise from the Project ID. Work resources are Labor, Work resources in an Equipment, Plant or Nonlabour group are Nonlabor, and Material resources are Material (assignment quantity). Cost resources, costs, baselines 1 to 10, notes, task types and timephased contours are not mapped; the source badge next to the file name lists what was not mapped. Recurring calendar exceptions use only their first occurrence. A binary .mpp file is recognised (version shown) but not read; save it as XML in Microsoft Project. Export to P6 XER writes a new .xer file from the opened XML and never changes the source.
      Colour scheme

      Colours follow Pantone references (hex equivalents). WBS bands, from Level 1 down to Level 7 and deeper: Pantone 289 C #0C2340, 288 C #002D72, 287 C #003087, 285 C #0072CE, 284 C #6CACE4, 290 C #B9D9EB, and 656 C #DDE5ED. The menu bar is Pantone 289 C. The toolbar and panels use Cool Gray 1 C tints (#F4F4F2). Borders are Cool Gray 5 C #B1B3B3, secondary text Cool Gray 9 C #75787B, and body text Black 6 C #101820. Accent (primary buttons and the selected row) is Pantone 1495 C #FF8F1C, used sparingly; the selected row tint is #FFF1E0. Float Path 1 is Pantone 2597 C #5C068C so it does not clash with the accent. Gantt bars stay blue (actual), green (remaining), red (critical) and yellow (baseline).

      DCMA 14-Point Schedule Assessment
      #CheckThresholdMetricCountEligible%Result